Issued: November 24, 2025 by:

Bright Property Maintenance

Noel Tejas
1522 18th AVE N
Lake Worth, FL 33460
US
Due: December 30, 2025 to:

Rayus Radiologys

1425 Gateway Blvd
Suite 100
Boynton Beach, FL 33426
US

Paid

Service 1.0

West Palm Beach, Palm Beach Lake

3 iPad Holder 45

Pet/Nuc Bathroom (water tank flap/chain replaced)  $15 Hand Work , $7.99 Materials 

Ultrasound Bathroom(Lock door replaced) $15 Hand Work, $67.99 Commercial Lock 

Bathrooms (Pipe water cleaned) $35 

Tile/Grout/Carpet Cleaning Floor  $2200

High dusty deep cleaning $600

Price

$2,985.98

Amount

$2,985.98

Service 2.0

East Boynton corporate,

Second Floor (Bathroom clogged $30

First floor(Water tank fixed) $15 Hand work, $16.99 Materials

Second Floor (Principal Office electricity ) $15

Second Floor (Spoon dispenser) $30

First Floor (Bathroom behind janitorial replaced Light) Hand Work $35, Materials $59.99 

Second Floor (wall and carpet stains from dropping water on carpet cleaned) $100

First floor (1 hair ensembled) Hand Work $15

 First Floor (Hang decorative painted) $15

First Floor (Suite 101 Bathroom chain/flapper replaced) Hand Work $15 , Materials $16.99

First floor (Biohazard Cleaning in Patient Bathroom) $150

First floor ( 4 T5 Bulb Lights replaced )  Hand work $40 , Materials $12.99 each

First Floor (Suite 101 Soap dispenser Installed  Hand Work $10

First floor (Tile/grout/Carpet cleaning)  $2500

High Dusty Deep Cleaning $600  

  

 

Price

$3,715.93

Amount

$3,715.93

Service 3.0

Delray Beach,

Fixed electricity on kitchen $10

Water sink fixed in Ultrasound 1 and 2 ,hand work $20

Water Sink fixed, Hand work $10, Materials $9.99

8 Bulb T5 replaced  Hand work $80, materials $13.99 each (111.92)

2 Bulb 4pins replaced , hand work $20, Materials $12.99 each (25.98)

1 bulb 4pins front office ,hand work $10, Materials $12.99

High dusty deep cleaning $600

Front office ceiling repainted and bubble ceiling repainted Hand work $150, Materials $40 

2 bulb T5 Front office hand work $10, Materials $13.99 each (27.98)

2 bulb 4pins Hand work $20, Materials $12.99  (25.98)

Tile/grout and wax floor $2200

Carpet cleaning  $400

 

Price

$3,784.84

Amount

$3,784.84

Service 4.0

Palm Beach Gardens,

Unclogged bathroom $150

Automatic door fixed $20

Water tank toilet fixed $50

Pipes drain pressure water $50

Price

$270

Amount

$270

Service 5.0

West Boca 441, Broward

Plastic Tub mounted in MR2 $10

Back Unclogged bathroom $150

3 Bulb T8 changed in Mammo room ,hand work $30, materials $30

1 Bulb T8 Lobby Bathroom Hand Work $10, Materials $10

4 Bulb T5 in Lobby Changed, Hand Work $40, Materials $13.99 each (55.96)

Ensembled two shelf $40

Ensembled one drawer $30

2 ceiling tile changed $20

Tight bathroom door employee $10

2 Bulb T5 , Hand work $20, Materials $13.99 each (27.98)

10 bulb T8 changed, hand work $100 , Materials $59.99  

Employee bathroom Fixed lock $20

5 ceiling tile replaced $50

Pressure washer with clean water pipes $15

employee Bathroom light replaced ) Hand Work $35, Materials $59.99 

Tighten toilet seat patient $10

 

 

 

Price

$833.92

Amount

$833.92

Service 6.0

East Boca, Glade rd

Vents Cleaning $150

2 bulb T5 , Hand work $20, Materials 13.99 each (27.98)

Seat toiled tighten $10

Switch replaced in bathroom women’s center Hand work $15, Materials $2.99

4 chairs ensembled $80

Switch replaced hallway CT ,hand work $15, materials $7.99

Floor repair $30

1 bulb light T5 women’s center $10, Materials 12.99

1 Hand Sanitizer replaced $10

4 bulbs T5 replaced Hand work $40, Materials 12.99 Each (51.96)

   

 

Price

$468.91

Amount

$468.91

Service 7.0

West Boynton,

2 Hand sanitizer $20

1 Soap Dispenser $10

1 Bar Hand Towels $10

2 Bags Holder $20

1 Gloves Holder $10

2 T8 bulb replaced $20 Materials Price $10 Each ($20)

4 T5 Bulb replaced $40  Materials Prices $13.99 Each ($55.96)

4 Hand Sanitizer $40

 

  

 

Price

$245.96

Amount

$245.96

Service 8.0

Wellington Women’s Center

Metal Holder fixed in Mammo 1 $15

security Mirror installed $10

 

Price

$25

Amount

$25

Service 9.0

Main Wellington,

Clogged toilet $150

5 ensembled chairs $50

back door adjustable $10

Holder paper installed $10

2 Bulb changed $20, materials cost 12.99 each ($25.98)

1 Hand Sanitizer $10

1 lock installed in patient bathroom door $30, materials $60

Paint high building number identification front/back $40

Outlet replaced at CT $15

10 bulb 4pin replaced $100, materials cost 12.99 each(129.90)

6 T5 replaced $60, materials cost $13.99 each ($83.94)

CT Ceiling roof reconstruction Hand work $200, materials cost $150(Compound, Flat Paint, ceiling drywall.

Furniture move out $50

Price

$1,194.82

Amount

$1,194.82

Service 10.0

Card Processing & Transaction Fee of 1.5%

Price

$180.89

Amount

$180.89

Total Paid

Terms & Conditions

NOTE: All credit card payments are subject to a 2.9% processing fee.

Total of $13,706.25 has been Paid

Invoice History

Updated 268 days ago

Invoice updated by Noel Tejas.

Updated 262 days ago

Invoice updated by Noel Tejas.

Updated 254 days ago

Invoice updated by Noel Tejas.

Updated 254 days ago

Invoice updated by Noel Tejas.

Viewed 254 days ago

Invoice viewed by 194.135.132.136 for the first time.

Viewed 247 days ago

Invoice viewed by 134.199.109.37 for the first time.

Viewed 247 days ago

Invoice viewed by 193.46.204.146 for the first time.

Payment 247 days ago

WooCommerce CheckoutPayment Total: $13,706.25

Status Update 247 days ago

Status changed: Pending to Paid.