$336.98

Category:

Description

East Boynton corporate,
2 heavy Office changed Hand work $60.00 each $120.00
Zinc battery changed Hand work $10.00
1 Faucet changed at brake room first floor Hand work $30.00 (Materials paid by Rayuz)
1 Oulet changed on second floor, Hand work $20.00, Materials $1.99
1 Luz led replaced at front desk Hand Work $30.00 Materials $4.99
Front offcie door painted Hand work $30.00 each  
Doors Hallway painted Hand Work $30.00 each

 

Reviews

There are no reviews yet.

Be the first to review “East Boynton corporate, 2 heavy Office changed Hand work $60.00 each $120.00 Zinc battery changed Hand work $10.00 1 Faucet changed at brake room first floor Hand work $30.00 (Materials paid by Rayuz) 1 Oulet changed on second floor, Hand work $20.00, Materials $1.99 1 Luz led replaced at front desk Hand Work $30.00 Materials $4.99 Front offcie door painted Hand work $30.00 each   Doors Hallway painted Hand Work $30.00 each  ”

Your email address will not be published. Required fields are marked *