Description
Stripping Wax works area
Classrooms on first floor 104-121 and 125
Classrooms on Second floor 200-201 and 204
Hallways on first and second floor, floors around stairs, Lobby first floor, cafeteria first floor, kitchen first floor, brake room on
second floor
NOTE: Description of the job, We’ll Put paper protector on the baseboard, move out/in all or any objects from the floor, regular , the vacuum floor, regular cleaning , for get out all debris or hair out before start to add chemicals at the floors and wait 5 minutes before use Strip machine , water vacuum machine to get the water and chemicals out, we’ll start to add the first layer wax and of we need to wait until the floor is dry with the air conditioner temperature at 60% and after that we’ll repeat this process as it need it until get the best result that we wait, we will be in contact the following day to assure that the job was done correctly.




Reviews
There are no reviews yet.